PHOENIX CANTECH S.A.C (PHOENIX CANADA) (2009)
PORT: PAITA –CALLAO
Import of oil well drilling equipment and machinery for projects/services performed by Phoenix for its clients in Peru.
 
     
 
BPZ ENERGY INC. PERU SUBSIDIARY (2006-2008)
PORT: PAITA – TALARA
Implementation of gas power plant (three stages).
1st stage: Equipment for oil well drilling and production in Tumbes continental shelf.
2nd stage: Undersea pipeline for gas transportation from the well to Zorritos.
3rd stage: Turbines and equipment for electric power plant mounting.
At all stages, advice on customs matters and customs brokerage services
.
 
     
 
PETRO TECH PERUANA – (2006-2007)
PORT: TALARA – PAITA  – PISCO 
Support equipment for oil well drilling and production in Talara, Piura and Pisco. Such equipment included barges, pipes, tanks and general machinery.
 
     
 
MINISTRY OF ENERGY AND MINES (2003-2005)
PORT: CALLAO – SALAVERRY – MATARANI
The Executive Bureau of Projects was provided with a wide range of services. These services included maritime transportation, tariff classification, customs procedures, land transportation and storage of 8 m, 12 m, wood posts with a total weight of 16,000 tons to be used for electric frontier expansion. Such posts were imported from Argentina and United States.
 
     
 
PETRO TECH PERUANA – RESEARCH VESSEL (2003)
PORT: PAITA
The customs brokerage service was required again for research vessel “GULF SUPPLIER” which was used for marine sismics. Temporary admissions, partial and total re-exportation of the vessel, including all its equipment.
 
     
 
PETRO TECH PERUANA – RESEARCH VESSEL (1999-2001)
PORT: PAITA
The customs brokerage service was required for research vessel “GULF SUPPLIER” which was used for marine seismics. Temporary admissions, partial and total re-exportation of the vessel, including all its equipment.